Machine Overhaul

Machine overhaul after

Location: Revesby, NSW/Stenmar workshop

Budget: approx: $120k

Scope: Overhaul and upgrade steel manufacturing machine

Open Project Documentation

Services provided:

  • Disassembly and assessment of components
  • 2 x hydraulic pumps—overhauled
  • 5 x hydraulic motors—supplied and installed
  • 2 x hydraulic motors—overhauled and tested
  • 3 x relief valves and manifolds—supplied and installed
  • 4 x cylinders—overhauled and tested
  • 5 x valves—repaired and tested
  • New directional valve bank—supplied and installed
  • All filtration replaced
  • Hoses and tubework—supplied and installed
  • Machining and fabrication—repairs to rollers, brackets, clamps, etc
  • Upgrades to filtration, accumulators, cooling circuit
  • Reservoir—emptied, cleaned, re-worked, re-sealed
  • Re-paint
  • Replace all drive belts
  • Replace thermostat
  • Rework heat exchanger
  • AutoCAD circuit schematic
  • Onsite re-commissioning.
Before
hydraulic valves before
After
Press hydraulic power unit valve set_after
After
hydraulic valves_after
Before
Machine requiring overhaul
After
Machine overhaul after

Hydraulic Supplies

Our Sydney warehouse stocks a huge range of hydraulic supplies from brands including Hydac, Danfoss and Eaton Vickers, plus rare spares. Our engineers advise customers on best option hydraulic pumps, cylinders, motors, transmission and other parts.

Unit 2/360 Vardys Rd
Kings Park NSW 2148

Contact Stenmar Group

For your hydraulic servicing needs